Cutler Ridge Section 3 Resurfacing and Drainage Improvement Project
Location:
The project area is bounded by and including Montego Bay Drive to the north, Bluewater Road to the east, Pan American Drive to the south, and Anchor Road to the west.
Estimated Start:
Construction is tentatively scheduled to commence in March 29, 2021.
Estimated Completion:
Project is anticipated to be completed in 240 days.
Summary:
The Cutler Ridge Section 3 Resurfacing and Drainage Improvement Project will be carried out in two phases. The purpose of these proposed improvements is to restrict the discharge of hazardous pollutants to area canals and to improve water quality and quantity treatment.
Phase One of the project will see drainage improvement (including milling and resurfacing) to the area bounded by and including Montego Bay Drive to the north, Bluewater Road to the east, Pan American Drive to the south, and Anchor Road to the west. It will take approximately 180 days to complete.
Phase Two of the project will see the milling and resurfacing to the area bounded by Montego Bay Drive to the north, Anchor Road to the west, Gulfstream Road to the east, and SW 212th Street to the south. It will take approximately 60 days to complete.
The project will consist of drainage improvements, exfiltration trenches for water quality treatment, new outfall pipe connection, roadway resurfacing, pavement markings, and site restoration. The paving scope of work will generally consist of 1” edge milling (3’ wide strip) and 1” resurfacing. The drainage will consist of installation of continuous exfiltration trenches (anticipating 24” diameter) interconnected with catch basins and manholes.
Road Access:
Access to local roads will be maintained during construction, however, traffic patterns in the area will be altered as the project progresses and delays will be expected.
Funding:
• $1,352,022 - Town’s People’s Transportation Fund (“PTP”)
• $200,000 - State Appropriation Grant
(FDEP)
• $250,000 - Stormwater Utility Fund
Additional Information:
For additional information regarding this project, please contact Public Works Director Alfredo Quintero, Jr. at (305) 234-4262 or aquintero@cutlerbay-fl.gov. You are also welcome to sign up for our emails to receive the latest news on this project at www.cutlerbay-fl.gov/subscribe and follow us on Facebook, Twitter and Instagram at @TownOfCutlerBay.